- Construction Change Order Form: How to Document a Project Change
- What is a construction change order?
- When should you issue a change order form?
- Fields every change order should include
- Example: a change order that adds and removes work
- How to fill out a construction change order form
- Change order versus other construction paperwork
- Common change-order mistakes
- Legal references and related templates
Construction Change Order Form: How to Document a Project Change
Short answer: A construction change order form documents an approved change to work already covered by a construction contract. It should identify the project and original agreement, explain the revised scope, show the exact increase or decrease in price, record any change to contract time and include the signatures required by the parties’ agreement.
Suppose a restaurant owner adds a walk-in refrigerator after kitchen construction is underway. The contractor needs to install electrical service and change the floor layout. If the parties simply agree by phone, they may disagree later about the equipment, added labor and opening date. A signed change order makes those adjustments visible and traceable.
Standard Construction Change Order Form — Sample Contract Language
A fictional contractor renovating a retail store has an original contract for $90,000. Two earlier approved changes total $5,000, bringing the current contract to $95,000. The owner requests a custom entry door costing $3,600 and removes standard shelving with an agreed $1,100 credit. Change Order 003 therefore adds a net $2,500, bringing the revised contract sum to $97,500.
What is a construction change order?
A change order modifies specified contract requirements after the original contract is signed. It may add work, delete work, substitute materials or change how work is performed. It can increase or decrease the contract amount, extend or shorten project time or leave one of those items unchanged. The form should state each result explicitly.
In the AIA’s standard contract framework, a change order documents agreement on the revised work, contract sum and contract time among the required parties. Other contracts may define different approval roles or notice rules. Always check the executed agreement before deciding which signatures make the change effective.
When should you issue a change order form?
Use one when the owner requests an upgrade, the design team revises the drawings, unforeseen site conditions call for additional work or an item is removed from scope. Changes may also result from building inspector instructions, substitutions and revised accessibility requirements. An owner might request a credit for an omitted fixture rather than adding cost.
Do not treat every field directive as a fully approved change order. A request for information, proposed change order, architect’s supplemental instruction and construction change directive may have different contractual effects. Confirm whether the change needs agreement first or whether the governing contract permits a separate directive mechanism.
Fields every change order should include
Project references and control number
Record the project name, address, owner, contractor, original contract date and unique change-order number. Add the preparation and approval dates. Reference the affected drawing numbers, specifications, proposal or site instruction. Consistent numbering helps the team match invoices, schedules and revised drawings.
A change order without a reference to the underlying contract can create confusion if several contractors work at the same site. Include the full legal entities, particularly when a property manager or construction manager has authority to review but not sign binding modifications.
Detailed scope of the requested change
Describe exactly what will be added, removed or replaced. Note material models, quantities, labor activities, locations, testing and cleanup obligations. Reference attachments and indicate whether the change supersedes a prior instruction. For substitutions, document any difference in performance, appearance, maintenance or warranty.
Compare the change against the original scope so that already included work is not billed twice. If a framing change requires repainting and disposal, identify those dependent tasks. A vague line reading “additional site work” makes later reconciliation difficult.
Price adjustment and supporting breakdown
Show additions, credits and the net change as separate values. Break down labor, material, equipment, subcontractor quotations, tax, overhead and markup where applicable. State whether agreed prices include procurement, storage and disposal. Use the original contract’s rules for unit rates and markup instead of silently introducing new rates.
The revised contract amount should be mathematically traceable: original contract amount plus prior approved changes plus this change equals the new contract amount. If the proposed change costs $4,200 but removes work worth $900, the net addition is $3,300. Any tax treatment or contractual markup belongs in the calculation, not in an unexplained footnote.
Schedule impact and critical path
State the number of calendar days or working days added or deducted, or write “no change” if that is the negotiated result. Explain why the work affects completion and whether ordering lead times or reinspection will be required. An extension should identify the affected milestone and the revised completion date.
A cost adjustment does not automatically grant additional time. Likewise, a schedule extension should not be assumed to include compensation for delay unless the contract and signed change order say so. The team should assess the actual schedule and contractual notice requirements.
Approvals and work authorization
Identify who may approve the work and when authorization takes effect. Depending on the contract, signatures may be needed from owner, contractor and architect. State whether work may begin before final approval and which emergency or directive procedures apply if immediate action is needed. Keep draft status distinct from authorized status.
For electronic approvals, retain a clear record of signatories, version, date and associated attachments. A spreadsheet estimate or informal text message may be useful evidence, but it may not satisfy the executed contract’s change procedure.
Example: a change order that adds and removes work
A fictional contractor renovating a retail store has an original contract for $90,000. Two earlier approved changes total $5,000, bringing the current contract to $95,000. The owner requests a custom entry door costing $3,600 and removes standard shelving with an agreed $1,100 credit. Change Order 003 therefore adds a net $2,500, bringing the revised contract sum to $97,500.
The custom door requires a six-day lead time that affects the entry inspection, so the parties approve a four-calendar-day extension after checking the schedule. The form describes the door specification, shelving deletion, amounts and revised completion date. These numbers are illustrative and do not reflect market prices.
How to fill out a construction change order form
- Confirm the contract. Read the change, notice, pricing and signature provisions first.
- Assign a unique number. Link the form to the project and underlying agreement.
- Describe revised work. Attach updated drawings, quotes and specification sheets.
- Calculate the net price. Separate additions, deductions, taxes and permitted markup.
- Assess the schedule. Record the measured time effect or explicitly state no change.
- Obtain authorized approval. Make clear whether the form is proposed or fully executed.
- Update records. Revise project budgets, work orders, schedules and invoice references.
Change order versus other construction paperwork
A request for information clarifies drawings or scope questions but does not necessarily change the contract. A construction change directive, where authorized by the agreement, may direct work before all cost or time effects are agreed. A change order records the parties’ agreement to a modification. A new construction agreement may be better when parties are starting an entirely separate project.
For longer jobs, maintain a change log with proposed, pending, rejected and approved items. The log is a management tool, while each executed change order is the supporting contract record. Never mark a pending estimate as approved merely because materials have been discussed.
Common change-order mistakes
- Starting non-emergency extra work before the required authorization.
- Failing to distinguish approved changes from pending proposals.
- Quoting a total without itemizing credits or markup.
- Leaving the revised completion date blank when the schedule has changed.
- Not referencing drawings, sketches, contractor quotes or written site instructions.
- Double-billing work already included in the original scope.
- Neglecting to update the project’s total contract sum after earlier change orders.
Legal references and related templates
The change order agreement template may suit changes to other kinds of service contracts, while a scope of work template helps describe detailed deliverables. Lex can help compare an original contract and proposed change order, flag mismatched amounts and outline missing schedule effects for review.
- AIA Contract Documents: fundamentals of construction change orders.
- OSHA construction training requirements, relevant to changed work hazards.
- U.S. Department of Labor: wage requirements for covered public projects.
Key takeaway: A construction change order should make the revised work, new total price, updated schedule and required approval easy to verify against the original contract.
Educational information only. Change-order authority and enforceability depend on the signed construction contract and applicable local law.
Get your complete legal document in minutes
-
Step 1
Select a template
Start with a ready-made legal template built for common real-world needs.
-
Step 2
Add your details
Fill in the key facts and tailor the document to your situation.
-
Step 3
Review & export
Check the finished document, make edits if needed, then download or export it.
Construction Change Order Form FAQs
What is a construction change order form?
It documents an agreed change to a construction contract, including revised scope, price or credit, time impact and required approvals.
Who must sign a construction change order?
Follow the original contract. The owner, contractor and sometimes architect or other authorized party may need to sign.
Can a change order reduce a contract price?
Yes. Removing or substituting work may create an agreed credit. Show additions and deductions separately and calculate the net change.
Does every change order extend the schedule?
No. State the actual agreed time impact or expressly record that the completion time is unchanged.
Can a contractor start extra work before approval?
The contract governs authorization, subject to applicable laws and emergency procedures. Unapproved work can create serious payment disputes.
What is the difference between a change order and a change directive?
A change order records an agreed modification. Some construction contracts separately permit directives before all cost or time effects are agreed.
Similar
Similar templates
Other published templates that share a group, a category, or meaningful words in the title.
Order Form
Use this order form template to document products, services, quantities, prices, delivery dates, payment terms and customer acceptance in one clear record.
View templatePre Order Terms Template
Customize pre order terms covering payment, estimated shipping, delays, cancellation, refunds, inventory limits and customer updates.
View templatePurchase Order Terms and Conditions
Download purchase order terms and conditions for goods, pricing, delivery, inspection, payment, product warranties, rejection rights, and supplier disputes.
View templateBusiness Sale Agreement
Use a business sale agreement template to outline price, included assets, liabilities, closing conditions and seller obligations. Get a practical checklist.
View templateAsk Lex
Start with the right legal document.
Find a template, fill in your facts, and use LawyerAI when you want a clause explained before you finish the draft.